
Add to Cart
Car Park Barrier Gate with Folding Boom for Parking Lot Barrier Gate Security Systems
Automatic Barrier Gate Brief Introduction
The product consists of four parts: cabinet, transmission mechanism, control unit, and boom. It distinguishes between left-installed and right-installed, and it is used in parking lot entrance and exit control systems.
This product is divided into three types: barrier gate with straight boom, barrier gate with folding boom, and barrier gate with fence boom.
Boom Barrier Basic Features:
1. DC24V brushless motor, equipped with connecting rod transmission mechanism and balance spring, low power consumption, high efficiency, and lower noise.
2. With auto-reversing on obstruction function and delay auto-closing function, support counting function and motorcade passing mode.
3. Support external radar, loop detector, infrared photocell anti-smashing function, built-in DC 12V power output, can be used for external radar power supply.
4. Support RS485 communication or RS485 off-line connection.
5. DC24V power supply is optional.
Model | WJDZE-BL (speed 1.5~6s adjustable) | |||||||
Running Speed | 1.5s | 3s | 4s | 5/6s | 6s | 6s | 6s | 6s |
Boom-Type | Straight | Straight | Straight | Straight | 90° Folding | 180° Folding | 2 Fence | 3 Fence |
Max Boom Length | 3m | 4.5m | 5m | 6m | 5m | 4m | 4.5m | 4m |
Input Voltage | AC100~264V | |||||||
Frequency | 50/60HZ | |||||||
Motor Voltage | DC24V | |||||||
Enclosure Rating | Ip54 | |||||||
Working Temperature | -35℃~ + 70℃ | |||||||
MTBF | 3,000,000 times | |||||||
Max Motor Power | 180W | |||||||
Max Motor Speed | 24r/min |
Folding Boom Installation
Step 1. Fix the boom fixing plate on boom with 2pcs of M12*70mm hexagon screw.
Step 2. Hold the fixing plate by hand, then lift up the boom vertically and install it on the boom holder. And then install the flat washer, spring washer, and M12 nut on the screw in turn, and fix the screw with a wrench.
Step 3. Fix the rod and connecting bearing on the support board components with screw.
Step 4. Loosen the bolsters with right-hand and left-hand screw, rotate the stainless steel pulling rod then adjust the horizontal and vertical of the boom; after adjustment, lock the bolsters with right-hand and left-hand screw.